Explore how BHC combines technical expertise with innovative technology to deliver high-impact, defensible solutions for municipalities and private partners across real-world projects.
DNT to SH-289: Approximately 10,600 ft of four lanes of an ultimate six lane divided thoroughfare, with a 250 ft long, four lane separated grade crossing at the Burlington Northern & Santa Fe RR.
7,900 L.F. or four lane of ultimate six lane divided roadway with 400 ft long bridge over Slayer Creek.
Replacement of existing asphalt section to a reinforced concrete section with 100-Year design for drainage & utility replacements.
The length of the alley proposed for replacement is approximately 1,650 linear feet, and has a width of approximately 10 feet. The proposed alley design will be an inverted 8-inch x 5-inch x 8-inch (3-inch invert) reinforced concrete pavement section with a lime stabilized, compacted subgrade.
Preparation of construction plans and specifications for paving and drainage improvements to MacArthur Boulevard from IH-30 to the Trinity River. Overall length of project 4,700 linear feet.